Supply Project and The Establishment of Sea Water Pumping Stations (201 C01)

Supply project and the establishment of sea water pumping stations (201 C01)

Client              : Royal Commission for Jubail & Yanbu
Location         : Ras Al Khair
Start                : 2013
Completion    : 2018

Project Description

The project belongs to Royal Commission Jubail & Yanbu and located in Ras Al Khair, Eastern Province of Kingdom of Saudi Arabia. The scope includes construction of a sea water pumping station to provide cooling water for various industries in Ras Good Industrial Area with a capacity of 75.000 m3/h for the first phase. The project consists of construction of Seawater Cooling Pump Station, Hypochlorite Generation Building, Staff/Control Building, Switchgear Building, Guard House, SEC Building, Workshop Building and 115 kV Power Supply.

Al-Jubail Riyadh Line C High Point Terminal

Al-Jubail Riyadh Line C High Point Terminal

Client              : Saline Water Conversion Corporation (SWCC)
Location         : Riyadh
Start                : 1993
Completion    : 2002

Project Description

The purpose of the project was to receive the potable water through Line-C, chlorinate this water and transmit to Riyadh-Qassim Water Transmission Line. Scope of Yuksel was design and construction of all civil works such as buildings, pipe laying and electromechanical erection activities (i.e., pressure relief systems, valves, instrumentation, pumps, telecommunication and telecontrol equipment, etc.). Yuksel performed design supply and all kind of civil works for the construction of Electrical Building, Scraper Building, Chlorination Building, CO2 Tank Shed, Relief Basin and Pressure Relief System.

Al-Jubail Reverse Osmosis Desalination Plant

Al-Jubail Reverse Osmosis Desalination Plant

Client              : Saline Water Conversion Corporation (SWCC)
Location         : Al-Jubail
Start                : 1992
Completion    : 1998

Project Description

The project was designed as a turnkey construction of seawater reverse osmosis plant with a capacity of 20 million gallons (approximately 91,000 m³) per day. Yuksel’s scope of work consists of all civil works, buildings, supply and erection of steel structures, design and construction of outdoor facilities along with complete erection of electro-mechanical process equipment, piping and instrumentation.

Yanbu Desalination and Power Plant, Phase 2 – Lot 1

Yanbu Desalination and Power Plant, Phase 2 - Lot 1

Client              : Saline Water Conversion Corporation (SWCC)
Location         : Yanbu
Start                : 1990
Completion    : 1998

Project Description

The Yanbu Power Plant Phase 2 project was undertaken to build and commission a power plant of 2 x 80 MW in Yanbu, Desalination Plants Phase 1. Yuksel’s scope of work consisted of building concrete buildings (14,500 m²) and steel buildings (2,000 m²), concrete duct bank (5,000 m), tank foundations, reinforced concrete chimney (13 m diameter and 93 m height), offices, roads, sewerage and potable water systems, lighting, landscaping and fencing. Moreover, Yuksel constructed 11 bachelor villas, 7 family villas and 1 restaurant for SWCC employees.