Site Preparation Work, Jeddah

Site Preparation Work, Jeddah

Client              : US Army Corps of Engineers (USACE)
Location         : Jeddah
Start                : 2022
Completion    : 2023

Project Description

The purpose of the project is site development of 3 different zones in King Abdullah Air Base in Jeddah, KSA. The project scope includes site preparation, grading for drainage (storm), aggregate access road with vehicle gate, debris removal, security fence around the site perimeter and a 200 m x 100 m gravel pad. Total development area will be 1,531,077 Square Meters (SM) for Munitions Storage, Life Support & Air Defense Artillery Areas in KAAB.

Completion of Storm water drainage network in the district of Eastern Quarters Phase 1 in Riyadh

Completion of Storm water drainage network in the district of Eastern Quarters Phase 1 in Riyadh

Client              : Riyadh Municipality
Location         : Riyadh
Start                : 2022
Completion    : 2025

Project Description

Construction of Storm Water Networks with RC/GRP pipes and precast concrete box channels including trench works, supply & laying of pipes and culverts, re-asphalting, traffic detours, thrust boring works and relocation of existing utilities at Eastern districts of Riyadh City. Project scope includes more than 60 km of network up to dia 1400 mm, over 20,000 m3 reinforced box culvert, 180 meters thrust boring works and related earthworks and asphalting activities. 

Western Base Network Site Preparation Project, Taif

Western Base Network Site Preparation Project, Taif

Client              : US Army Corps of Engineers (USACE)
Location         : Taif
Start                : 2022
Completion    : 2023

Project Description

The purpose of the project is site development of 5 different zones in King Fahad Air Base in Taif, KSA. The project scope includes site preparation, grading for drainage (storm), aggregate access road with vehicle gate, debris removal, security fence around the site perimeter and a 200 m x 100 m gravel pad. Total development area will be 1,217,411 Square Meters (SM) for grubbing, clearing, site-preparation/earthwork and grading activities in KFAB.

RSLFAC Phase 2A Facilities & Infrastructure Al Qassim Aviation Institute

RSLFAC Phase 2A Facilities & Infrastructure Al Qassim Aviation Institute

Client              : US Army Corps of Engineers (USACE)
Location         : Qassim
Start                : 2022
Completion    : 2024

Project Description

The project mainly composed of the construction of Simulator Building at Land Forces Aviation Institute located in Al Qassim region including all civil and architecture works, MEP works, fire protection, asphalt roads, landscaping, drainage works, electrical and communication works like site lighting, lightning protection and fiber optic infrastructure. The project scope also includes all supporting facilities of simulator building, including electric services, water, sewer, fire protection, paving, walkways, curbs, gutters, drainage, existing MV line protection, tensioned fabric works and information systems.

Completion of Storm water drainage network in district of (Al Masanea, Al Shifa, Al Marwa, Bader, Namar, Al Hazm and Okaz Quarters) in Riyadh City

Completion of Storm water drainage network in district of (Al Masanea, Al Shifa, Al Marwa, Bader, Namar, Al Hazm and Okaz Quarters) in Riyadh City

Client              : Riyadh Municipality
Location         : Riyadh
Start                : 2020
Completion    : 2023

Project Description

Construction of Storm Water Networks with RC/GRP pipes and precast concrete box channels including trench works, supply & laying of pipes and culverts, re-asphalting, traffic detours, thrust boring works and relocation of existing utilities at Masanea, Shefa, Marwa, Bader, Namar, Hazm, Okaz districts in Riyadh City. Project scope includes more than 82 km of network upto dia 1400 mm, over 68,800 m3 reinforced box culvert, 500 meters thrustboring works, 7,000 meter channel works and related earthworks and asphalting activities.

King Faisal University Teaching Hospital Al Hassa Phase 2A

King Faisal University Teaching Hospital Al Hassa Phase 2A

Client              : Ministry of Higher Education-King Faisal University
Location         : Al Hassa / Hofuf
Start                : 2015
Completion    : 2021

Project Description

The scope of work is the construction of infrastructure of King Faisal University – Teaching Hospital Phase 2A including all civil, mechanical and electrical works.

Rehabilitation & Upgrading of the Main Roads North of Riyadh

Rehabilitation & Upgrading of the Main Roads North of Riyadh

Client              : Ministry of Municipal & Rural Affairs
Location         : Riyadh
Start                : 2019
Completion    : 2021

Project Description

Project mainly includes road development works with medians, sidewalks. Within this context reconstruction of the four main roads, upgrading of road entrances and exits, landscaping, irrigation network, plantation, lighting and asphalting works with providence of traffic safety means such as signals, signboards, land signs have been implemented.