Concrete Repair Works Khobar Phase 2 Power and Desalination Plant

Concrete Repair Works Khobar Phase 2 Power and Desalination Plant

Client              : Saline Water Conversion Corporation (SWCC)
Location         : Khobar
Start                : 2010
Completion    : 2015

Project Description

The purpose of this project was to carry out the concrete repair works for the concrete structures with jacketing, re-skinning, patch/local repair methods as well as demolishing & reconstruction.
  • Total demolished & reconstructed & repaired area: 109,111 m2
  • Total Concrete Amount: 13,951 m3
  • Total Steel Reinforced: 2,120 Ton
  • Total Structural Steel: 114 Ton
  • Total Excavation & Backfill Amount: 15,647 m3

Concrete Repair Works Shoaibah Phase 1 Power and Desalination Plant

Concrete Repair Works Shoaibah Phase 1 Power and Desalination Plant

Client              : Saline Water Conversion Corporation (SWCC)
Location         : Shoibah
Start                : 2010
Completion    : 2014

Project Description

The purpose of this project was to carry out the concrete repair works of the concrete structures with jacketing, re-skinning, patch/local repair methods as well as demolishing & reconstruction.

  • Total demolished & reconstructed and repaired area: 112,823 m2
  • Total Concrete Amount: 15,777 m3
  • Total Steel Reinforced: 2,430 Ton
  • Total Structural Steel: 489 Ton
  • Total Excavation & Backfill Amount: 26,294 m3

Reinforced Concrete Repair & Arresting of Water Leakage in of Riyadh Emergency Reservoirs Project

Reinforced Concrete Repair & Arresting of Water Leakage in of Riyadh Emergency Reservoirs Project

Client              : Saline Water Conversion Corporation (SWCC)
Location         : Riyadh
Start                : 2006
Completion    : 2010

Project Description

The purpose of this Contract is to implement Repair Damage reinforced concrete and arrested water leakage in compartments R1-C3 and R2-C4 of High Point Reservoirs in Riyadh. This include the provision of materials, equipment, labor and all things necessary for the implementation, completion and maintenance of the works indicated in the Contract, as well as all provisional, additional and complementary works and modifications requested to the Contractor by the Employer as per the Terms and Documents of the Contract.