Concrete Repair Works Khobar Phase 2 Power and Desalination Plant

Client              : Saline Water Conversion Corporation (SWCC)
Location         : Khobar
Start                : 2010
Completion    : 2015

Project Description

The purpose of this project was to carry out the concrete repair works for the concrete structures with jacketing, re-skinning, patch/local repair methods as well as demolishing & reconstruction.
  • Total demolished & reconstructed & repaired area: 109,111 m2
  • Total Concrete Amount: 13,951 m3
  • Total Steel Reinforced: 2,120 Ton
  • Total Structural Steel: 114 Ton
  • Total Excavation & Backfill Amount: 15,647 m3