Concrete Repair Works Shoaibah Phase 1 Power and Desalination Plant
Client : Saline Water Conversion Corporation (SWCC)
Location : Shoibah
Start : 2010
Completion : 2014
Project Description
The purpose of this project was to carry out the concrete repair works of the concrete structures with jacketing, re-skinning, patch/local repair methods as well as demolishing & reconstruction.
- Total demolished & reconstructed and repaired area: 112,823 m2
- Total Concrete Amount: 15,777 m3
- Total Steel Reinforced: 2,430 Ton
- Total Structural Steel: 489 Ton
- Total Excavation & Backfill Amount: 26,294 m3