Concrete Repair Works Shoaibah Phase 1 Power and Desalination Plant

Client              : Saline Water Conversion Corporation (SWCC)
Location         : Shoibah
Start                : 2010
Completion    : 2014

Project Description

The purpose of this project was to carry out the concrete repair works of the concrete structures with jacketing, re-skinning, patch/local repair methods as well as demolishing & reconstruction.

  • Total demolished & reconstructed and repaired area: 112,823 m2
  • Total Concrete Amount: 15,777 m3
  • Total Steel Reinforced: 2,430 Ton
  • Total Structural Steel: 489 Ton
  • Total Excavation & Backfill Amount: 26,294 m3